Two systems: planning and building control
Planning permission, from your local council, decides whether a development is acceptable: its size, how it looks and its effect on neighbours. Many smaller works are 'exempted development' and don't need it.
The Building Regulations set minimum standards for how buildings are designed and built: structure, fire safety, moisture, sound, ventilation, energy, access and more. They apply to extensions and material alterations whether or not planning permission was needed. Larger projects also involve building control notices and certification.
Work inside your home
Work that only affects the inside of a house, such as a new kitchen, bathroom, floors, joinery or decorating, generally doesn't need planning permission. The exceptions matter:
- Protected structures. Even internal work can need permission. Check your council's Record of Protected Structures.
- Apartments. Your lease and the management company's rules may control floors, windows and structural work.
- Structural changes. Removing a load-bearing wall doesn't usually need planning, but it does need an engineer's design and must meet the Building Regulations.
Extensions: the 2026 changes
New exempted development regulations came into effect on 27 July 2026, the biggest update to the rules for homeowners in almost 25 years. For extensions to the rear of a house:
- Up to 45 m² can be exempt, up from 40 m², where the house hasn't been extended before. Earlier extensions generally count towards the total.
- Upstairs space is limited. Any part above the ground floor is capped at 12 m² for terraced and semi-detached houses, and 20 m² for detached houses.
- The other conditions still apply, including leaving enough private open space behind the house (at least 25 m² under the long-standing rule), height limits and distances from boundaries.
The new rules also exempt dormer roof boxes and rooflights for attic conversions, within limits, and allow larger garden buildings such as sheds and home offices, up to 30 m². Until the end of 2030 they also allow detached 'granny flats' of 32 to 45 m², and the division of a house into two homes, each with notice to the council at least 14 days before work starts.
The Building Regulations that matter most
| Part | What it covers | Where it comes up |
|---|---|---|
| Part A | Structure | Removing walls, new openings, extensions, attic floors |
| Part B | Fire safety | Extensions, attic conversions, escape routes, smoke alarms |
| Part C | Site preparation and moisture | Damp-proofing and radon protection in new floors |
| Part E | Sound | Walls and floors between homes, especially apartments |
| Part F | Ventilation | Kitchens, bathrooms, utility rooms and airtight upgrades |
| Part K | Stairs, ladders, ramps and guards | Attic conversions, new stairs, balustrades |
| Part L | Energy | Insulation, windows, heating and major renovations |
| Part M | Access and use | Level access, door widths and toilets in new work |
Major renovations. When more than 25% of the surface area of a home's outer envelope is renovated, Part L requires the energy performance of the whole home to be brought up to the 'cost-optimal' level, as far as is technically, functionally and economically feasible. That level has been equivalent to a B2 rating, and the government has proposed raising it, so ask your designer to confirm the current target.
Building control: notices and certificates
Larger projects must be notified to the council's Building Control Authority through the online Building Control Management System before work starts. An extension of more than 40 m², for example, needs a Commencement Notice with design documents and statutory certificates, or, for a single home, an owner's opt-out declaration. Notices must reach the council 14 to 28 days before work begins.
Works that are exempt from planning have generally been exempt from these notices, but never from the Building Regulations themselves. Ask your architect or engineer which notices apply to your project, and who will certify the work.
Electrical and gas work: registered by law
In Ireland it's illegal for anyone other than a Registered Electrical Contractor to carry out most electrical work in a home, or for anyone other than a Registered Gas Installer to carry out gas work. Both must give you a certificate when the work is done.
You can check a contractor on the Safe Electric and RGI registers before work starts. Keep the certificates: buyers' solicitors will ask for them.
Before anything is demolished
- Asbestos. The Health and Safety Authority advises that asbestos can be found in any building built or refurbished before 2000, in materials such as old floor tiles, wall and ceiling boards, pipe lagging and roofing. Have suspect materials checked before they're disturbed.
- Radon. Taking up a ground floor or building an extension is the easiest time to add radon protection. In High Radon Areas, new homes need a radon barrier and a standby sump.
- Shared walls and neighbours. Work on a party wall needs your neighbour's consent, so talk to them early and take advice if you need to. Let neighbours know before noisy work starts.
Paperwork to keep for when you sell
- Planning permission and its conditions, or a note of the exemption you relied on, and any Section 5 declaration.
- Drawings, the engineer's design and certificates for structural work.
- Building control notices and completion certificates, where they applied.
- An architect's or engineer's opinion on compliance with planning and the Building Regulations.
- Electrical and gas certificates.
- Your BER certificate, product guarantees and photos of hidden work.
Questions
- Do I need planning permission for a new kitchen or bathroom?
- Generally not, if the work is inside the house and doesn't change how it looks outside. Protected structures are an exception, and the Building Regulations still apply to things like ventilation and electrics.
- How big can an extension be without planning permission?
- Since 27 July 2026, up to 45 m² at the rear of a house that hasn't been extended before, with limits on upstairs space, height, boundaries and the garden left behind. Check the conditions for your house before relying on it.
- Do I need an engineer to remove a wall?
- If it's load-bearing, yes. An engineer designs the beam and supports, and the work must meet the Building Regulations. Even a non-structural wall can hide pipes and cables, so check first.
- What is a Section 5 declaration?
- A decision from your local council on whether a particular project is exempted development or needs planning permission. It gives you certainty before you build.
Sources
- MyHome.ie: New planning regulations come into effect (July 2026)news.myhome.ie
- Fieldfisher: new Exempted Development Regulations 2026fieldfisher.com
- Beauchamps: Changes to residential exempted developmentbeauchamps.ie
- Dublin City Council: S.I. No. 338 of 2026, extensions up to 45 m²dublincity.ie
- Dún Laoghaire-Rathdown County Council: Can an extension cover my whole back garden?dlrcoco.ie
- gov.ie: Energy Performance of Buildings (major renovations)gov.ie
- gov.ie: Review of TGD L (dwellings) and TGD Fgov.ie
- Dún Laoghaire-Rathdown County Council: Commencement noticesdlrcoco.ie
- Dublin City Council: Commencement noticesdublincity.ie
- Houses of the Oireachtas: Building control and exempted developmentoireachtas.ie
- Commission for Regulation of Utilities: RGI and Safe Electric schemescru.ie
- CRU: Compliance and enforcementcru.ie
- Health and Safety Authority: what is asbestos?hsa.ie
- HPSC: Asbestoshpsc.ie
- EPA: Radon in homes (2024)epa.ie
This guide is general information, not legal, financial or professional advice. Grant amounts, rules and regulations change, so check the sources above or ask a qualified professional before you rely on them. Last reviewed 19 November 2026.