Wood floors that sit flat, true and quiet underfoot.
Herringbone, chevron and plank floors in solid or engineered wood. We test the base, level it, and set out every pattern from the centre of the room, so the finished floor looks right from every doorway.
- Subfloor moisture tested before we lay
- Patterns set out from the centre
- Underfloor heating planned in
What we take on.
Herringbone, chevron and plank floors in solid or engineered wood, on a base that's tested and levelled first.
Herringbone and chevron
Engineered or solid oak blocks, fully bonded and set out from the centre line of the room.
Plank floors
Wide or narrow boards, floated, glued or secret-nailed, depending on the base and the room.
Floor preparation
Moisture tests, levelling compound, plywood overlays and repairs to old boards and joists before anything is laid.
Underfloor heating
Engineered boards and adhesives suited to heated floors, laid once the heating has been commissioned.
Apartments
Acoustic underlays chosen to meet your building's rules, so the floor is quiet for you and for the neighbours below.
Finishing details
Skirting, thresholds, stair nosings and door trims, fitted so no expansion gap is on show. Doing the stairs too? See stairs.
A floor is only as good as what's under it.
Most floor problems, from gaps and creaks to lifting boards, start before the first board goes down. This is the work you won't see.
Test the base
New screeds can hold water for months. We measure before we lay: wood flooring guidance asks for under 75% relative humidity for a floating floor and under 65% to glue down.
Make it flat
We check with a two-metre straightedge and level the floor where it's needed, because hollows and humps come through as creaks, gaps and bounce.
Let the wood settle
Boards are stored in the room at normal living conditions for the time the maker recommends, so they adjust before they're laid, not after.
Set out from the centre
We strike centre lines and lay the first blocks in the middle of the room, so the pattern sits square to the walls and the cuts are even on both sides.
Fix it to suit the floor
Herringbone and chevron are fully bonded with flooring adhesive. Planks are floated, glued or nailed to suit the base and the room.
Leave room to move
Wood moves with the seasons. We leave the expansion gaps the boards need and hide them under skirting and trims.
Every floor starts on a true line.
We level the base and set out from the centre of the room, so the pattern sits square to your walls. Drag across the picture to compare.

Illustration of our method. Photographs from our projects to follow.
Choosing your floor.
The decisions that shape how the finished room looks, lasts and costs. We'll talk them through with you on site.
Engineered or solid
Engineered boards have a real-wood top layer on a stable core, so they cope better with underfloor heating and changing conditions. Solid wood can be sanded more times over its life, but moves more.
Herringbone or chevron
Herringbone blocks meet at right angles in a staggered zigzag. Chevron blocks are cut at an angle, so the points meet in one clean, continuous line.
Oiled or lacquered
Oil gives a natural, matt look and small marks can be repaired in place. Lacquer resists spills and wear better and needs less upkeep.
Wear layer
On engineered boards, the thickness of the real-wood top layer decides how many times the floor can be sanded and refinished.
The facts behind the finish.
Rules, standards and science worth knowing before you start, with our sources.
Moisture limits
Before wood goes down, a sand and cement screed should read under 75% relative humidity for a floating floor and under 65% for a glued floor.
Source: Wood Flooring Association: engineered design glued installation guidelines
Underfloor heating
The heating should be commissioned and run before the floor is laid, and the floor surface kept at 27°C or below.
Source: Wood Flooring Association: engineered design installation guidelines
Everyday conditions
Wood floors are happiest at about 45 to 65% relative humidity and 15 to 25°C. Small gaps in dry winter weather are normal movement, not a fault.
Source: Wood Flooring Association: general installation guidelines
Apartments
Floors between homes must resist impact sound under Part E of the Building Regulations, and many management companies set rules on underlays. Check your lease before you choose.
Source: Engineers Ireland: sound insulation and the Building Regulations
Your questions, answered.
Anything else, just ask. Call +353 89 457 8129 or email [email protected].
- Can you lay a wood floor over underfloor heating?
- Yes, with the right floor. Engineered boards are usually the best choice. The heating needs to be commissioned and run before we lay, and the floor surface kept at 27°C or below.
- Can herringbone work in a small room?
- Yes. Smaller blocks suit smaller rooms, and setting out from the centre keeps the pattern balanced. We'll bring samples so you can see them in the space.
- Do you supply the flooring?
- We can supply it, or fit flooring you've bought. Either way, we check it suits your base, your heating and the room before we start.
- How soon can we walk on a new floor?
- A floating floor can usually be walked on straight away. A glued floor needs the adhesive to cure first, so we'll tell you the times for the products we use.
- Can you fix a squeaky or uneven floor?
- Often, yes. Squeaks usually come from loose boards, movement in the joists or an uneven base. We find the cause before we cover it up.
Planning a new floor? Let's talk.
Book a home visit. We'll look at the space, listen to what you want, and follow up with an itemised quote in writing.