Bathrooms · Dublin

Bathrooms planned as one job and built to stay dry.

Full bathrooms, en-suites, cloakrooms and walk-in showers. We plan the layout with you, coordinate every trade, waterproof before we tile and ventilate properly, so the room stays fresh and free of mould.

  • One plan for every trade
  • Waterproofed before tiling
  • Electrical work certified
What we do

What we take on.

Complete bathrooms and en-suites, planned as one job: layout, plumbing, waterproofing, tiling, ventilation and fittings.

  • Full bathroom renovations

    From strip-out to finished room: layout, plumbing, electrics, waterproofing, tiling and fittings.

  • En-suites and cloakrooms

    Clever layouts for small rooms, with storage and lighting planned in from the start.

  • Walk-in showers and wet rooms

    Level-access floors that fall to a drain, fully waterproofed, then tiled.

  • Accessible bathrooms

    Level entry, wider doorways, grab rails and seating, planned for now and for later. See accessible bathrooms.

  • Heat and ventilation

    Extract fans sized for the room, heated towel rails and underfloor heating.

  • Vanities and storage

    Fitted vanity units, recessed niches and built-in cabinets, made to measure.

The work underneath

The order that keeps a bathroom dry.

A bathroom involves more trades than any other room. Doing them in the right order, and checking what's hidden before it's covered, is what makes it last.

  1. Plan and measure

    We agree the layout, fittings and finishes with you, and check floors, walls, pipe runs and ventilation before work starts.

  2. Strip out and inspect

    Old fittings and tiles come out, and we check joists, walls and pipework for leaks or rot before anything is covered up.

  3. First fix

    Pipework and wiring go in. Electrical work is done by a Safe Electric registered contractor and gas work by a Registered Gas Installer, as the law requires.

  4. Board and waterproof

    Walls are boarded with moisture-resistant boards, then showers and wet floors are waterproofed before a single tile goes on.

  5. Tile and fit

    Tiling first, then the fittings: shower screen, toilet, basin, taps and furniture, sealed and tested.

  6. Ventilate and hand over

    The extract fan is fitted and tested, and you receive the electrical completion certificate and the product details.

From line to finish

Every bathroom starts waterproofed and level.

We waterproof every shower area and set out the tile joints from a level line before tiling, so the cuts match at both ends. Drag across the picture to compare.

The finished wall: large marble tiles on the same joints
A shower wall waterproofed with a membrane, with the tile joints marked out from a laser line

Illustration of our method. Photographs from our projects to follow.

Choices

Decisions worth making early.

The decisions that shape how the finished room looks, lasts and costs. We'll talk them through with you on site.

  • Shower tray or wet room

    A low tray is quicker and simpler. A wet-room floor gives level access and a seamless look, but needs a deeper build-up or a recessed floor.

  • Wall-hung or floor-standing

    Wall-hung toilets and vanities make a small room feel bigger and easier to clean, but need a frame built into the wall.

  • Tile size and grout

    Large-format porcelain keeps grout lines to a minimum. Epoxy grout resists staining and mould better in showers.

  • Heat

    Underfloor heating keeps a tiled floor warm and helps it dry quickly. A heated towel rail adds warmth and dries towels.

Good to know

The facts behind the finish.

Rules, standards and science worth knowing before you start, with our sources.

Questions

Your questions, answered.

Anything else, just ask. Call +353 89 457 8129 or email [email protected].

How long does a bathroom renovation take?
It depends on the size of the room and how much changes. A like-for-like bathroom is quicker than one where pipes and walls move. Your quote includes a timeline.
Can we use the bathroom during the work?
Usually not while the work is under way. If it's your only bathroom, tell us early and we'll plan the order of work with you to keep the time without it as short as possible.
Who does the plumbing and electrics?
We coordinate them as part of the project. Electrical work is done by a Safe Electric registered contractor and any gas work by a Registered Gas Installer, and you get their certificates.
Can you make a bathroom accessible?
Yes: level-access showers, grab rails, wider doors and seating. If you plan to apply for a Housing Adaptation Grant, talk to us early, as councils normally approve the grant before work starts.
Next step

Planning a new bathroom? Let's talk.

Book a home visit. We'll look at the space, listen to what you want, and follow up with an itemised quote in writing.

Call us Book a visit